Independent Flight Tracker Maps Real-Time Impact of FAA Ground Stop
Original source
Show HN: Live map of U.S. flights during tonight's FAA nationwide ground stop
Hacker News →An independent visualization tool captured the operational impact of the FAA’s nationwide ground stop on November 13, 2026, which halted all U.S. airport departures at 3:54 PM ET. The interactive map plots aircraft positions in real-time using community ADS-B tracking data from adsb.fi, layering that against departure patterns from the identical time one week prior to show the scope of disruption.
The tool displays tracked aircraft by altitude, missing flights from their expected positions, cumulative missed departures by airport, and recovery metrics showing when each facility returned to normal operational levels. It ingests data from two sources: the community-driven ADS-B network and the FAA’s NAS Status feed, allowing viewers to replay the event chronologically or examine specific airports. Being unofficial and unaffiliated with the FAA, the project demonstrates how publicly available flight tracking data can provide independent, real-time transparency during major operational disruptions.
Read the full article
Continue reading at Hacker News →This is an AI-generated summary. Read the original for the full story.